| Description |
Estimated Price (£) |
Paid Price (£)
|
Notes |
| |
|
|
|
| Misc |
|
|
|
| Mi16 Engine |
310 |
310 |
Had 112k on clock, blown head gasket |
| Turbo |
100 |
100 |
T25, was in nissan 200sx |
| Engine Stand |
28 |
28 |
Half alex's. Total price was 59 |
| Cleaning equipment |
20 |
16 |
Roll of paper, bowl, brush, degreaser |
| Quaife Diff |
500 |
475 |
From Pete faulkner, psooc group buy |
| Brakes |
450 |
365 |
307 setup - 283mm discs |
| Emerald ecu |
700 |
597.50 |
Including wiring for loom |
| Spark plugs |
5 |
20 |
Er, not sure how I managed to spend so much on plugs! |
| HT Leads |
20 |
12 |
|
| Coil pack |
40 |
10 |
|
| MAP sensor |
75 |
15 |
Manifold Air Pressure |
| Battery |
45 |
|
|
| Exhaust System |
150 |
|
Flanges, pipes etc |
| Oil Filter |
5 |
|
|
| Air filter |
35 |
|
|
| Oil |
25 |
|
High quality synthetic |
| Boost guage |
37 |
|
|
| Suspension bushes |
40 |
40 |
|
| Rolling road |
200 |
|
Emerald |
| Intercoolers |
50 |
20 |
|
| Pipework |
150 |
68 |
Samco |
| Assembly Lubricants |
30 |
10 |
Graphogen |
| Clutch |
130 |
267.59 |
Helix Uprated organic plate and cover |
| Clutch cable |
15 |
|
|
| Throttle bodies |
20 |
50 |
+ many hours of work |
| Boost control solenoid |
20 |
|
|
| Recirculating dump valve |
20 |
30 |
|
| strut brace |
30 |
|
|
| Bolts for flywheel and clutch |
25 |
25 |
|
| |
|
|
|
| Cylinder Head |
|
|
|
| Skim |
30 |
50 |
Roe engineering in fleet - acid dipped too |
| Camshaft Seals |
16 |
|
|
| Paint |
7 |
5 |
Colouring the cover |
| Timing belt |
15 |
|
|
| Head Gasket |
60 |
60 |
|
| Head Bolt |
40 |
12 |
|
| |
|
|
|
| Block |
|
|
|
| Liners & Pistons |
470 |
479 |
From QEP. Genuine Pug Parts |
| Main shells |
100 |
43.35 |
|
| Big end shells |
80 |
29.51 |
|
| |
|
9.39 |
|
| Main oil seal |
10 |
|
|
| front oil seal |
4 |
|
|
| oil pump chain |
8 |
|
|
| Uprated rear engine mount |
60 |
12 |
Stew form forum |
| Crank balancing |
40 |
75 |
Roe engineering (included clutch mod) |
| |
|
|
|
| Bodywork |
|
|
|
| Paint |
20 |
|
|
| Door pillars |
20 |
|
|
| Rust protection |
20 |
|
|
| |
|
|
|
| |
|
|
|
| |
Estimate total |
Total Paid so far |
|
| |
4399 |
2597.34
|
|